Southwest Connecticut Reliability Project: Phase 1
Correspondence related to The Connecticut Light & Power Company's cost application for the 345-kW Bethel-Norwalk Project in Southwest Connecticut.  
Date Document Title Document Type
Sep 14, 2006
Revised Cost Breakdown
PDF (15.1k)
Jul 14, 2006
Connecticut Attorney General Richard Blumenthal's comments on ISO-NE's June 15, 2006 draft determination letter for Bethel-Norwalk Project cost allocation.
PDF (101k)
Jul 14, 2006
Maine Public Utilities Commission comments on ISO-NE's June 15, 2006 draft determination letter for Bethel-Norwalk Project cost allocation. (ME PUC references RI PUC, NH PUC, VT PSB and VT DPS agreement with its comments.)
PDF (36.6k)
Jul 14, 2006
Connecticut Department of Public Utility Control and Office of Consumer Counsel joint comments on ISO-NE's June 15, 2006 draft determination letter for Bethel-Norwalk Project cost allocation.
PDF (78.6k)
Jul 14, 2006
Comments of the Massachusetts Dept. of Telecommunications and Energy on ISO-NE's June 15, 2006 draft determination letter for Bethel-Norwalk Project cost allocation.
PDF (99.6k)
Jul 14, 2006
Connecticut Light & Power Company's comments on ISO-NE's June 15, 2006 draft determination letter for Bethel-Norwalk Project cost allocation.
PDF (2.7Mb)
Jul 14, 2006
United Illuminating comments on ISO-NE's June 15, 2006 draft determination letter for Bethel-Norwalk Project cost allocation.
PDF (179k)
Jun 15, 2006
Connecticut Governor Rell's comments on ISO-NE's June 15, 2006 draft determination letter for Bethel-Norwalk Project cost allocation
PDF (83.7k)
Dec 28, 2005
CL&P's complete set of response to ISO's September 13, 2005 questions regarding the transmission cost allocation application for the Bethel-Norwalk Project in Southwest Connecticut
PDF (2.3Mb)