"C","Morning Report" "C","Report for 3/12/2010" "C","Report Generated 03/12/2010 13:16:26 GMT" "H","DESCRIPTION" "H","" "G","Report Type" "D","Morning Report" "H","DATE","TIME" "H","","" "G","1. Report Date" "D","Friday, Mar 12 2010","08:16:26 EST" "H","DESCRIPTION","VALUE" "H","","(MW)" "G","2. Peak Load" "D","Thursday, Mar 11 2010 hour ending 19",17068 "G","3. Operable Capacity Analysis" "D","A. Installed Generating Capacity",34139 "D","B.Capacity Additions EcoMax Bid > SCC",57 "D","C. Pre-OP4 Dispatchable Loads",0 "D","D. Generation Outages and Reductions",3321 "D","E. Uncommitted Available Generation (non fast start)",12439 "G","F. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","NYISO AC Ties",745 "D","NYISO NNC",0 "D","NYISO CSC",330 "D","NB",-410 "D","Phase 2",-1496 "D","Highgate",-218 "D","Net Deliveries",-1049 "D","G. Total Available Capacity (A+B+C-D-E-F)",19485 "D","H. Peak Load Forecast For Hour 19",16510 "D","I. Total Operating Reserve Requirement",2120 "D","J. Capacity Required",18630 "D","K. Surplus = (+) Deficiency = (-) (G - J)",855 "D","L. Replacement Reserve Requirement",0 "D","M. Excess Commitment Surplus = (+) Deficiency = (-) (K - L)",855 "G","4. Largest First Contingency" "D","HQ PHASE2",1496 "G","5. Annual Maintenance Schedule (A.M.S)" "D","Peak Load Exposure",19424 "G","6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1496 "D","Ten Minute Reserve Estimate:",1496 "D","Thirty Minute Reserve Requirement:",623 "D","Thirty Minute Reserve Estimate:",1478 "D","Expected ICU Operation","0" "D","Expected Actions of OP 4:","0" "D","Additional Capacity Available from OP 4 Actions:","0" "H","DESCRIPTION","TRANSFER LIMIT IN","TRANSFER LIMIT OUT","SCHEDULED CONTRACT" "H","(MW)","(MW)","(MW)" "G","7. Interchange Summary" "D","NYISO AC Ties",-1400,1200,879 "D","NYISO NNC",0,0,0 "D","NYISO CSC",-346,330,330 "D","NB",-1000,550,-410 "D","Phase 2",-2000,1200,-1396 "D","Highgate",-218,0,-218 "H","CITY","CONDITIONS","WIND","HIGH TEMP" "H","","","","(F)" "G","8. Weather Forecast Summary for the Peak Hour" "D","Boston","OVERCAST","E-11",40 "D","Hartford","OVERCAST","NE-10",43 "H","DESCRIPTION","VALUE" "H","","" "G","9. SAR Available" "D","NYISO","Yes" "H","DESCRIPTION","VALUE" "H","","(MW)" "G","10. Capacity of Non-Commercial Units" "D","Total Available",0 "G","11. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "D","0 Units",0 "H","DESCRIPTION","VALUE" "H","","" "G","12. Solar Magnetic Disturbance Activity" "D","Forecast:","" "D","Alert:","" "D","Intensity:","" "D","Observed Activity:","" "D","Actions Taken or Planned by ISO-NE:","" "D","Actions Taken or Planned by Other Control Areas:","" "T","44 Lines"