Data Index
A
- Actual Load, Cleared
- Ancillary Services
- Annual Maintenance Schedule (AMS)
- ARR
- Auction Revenue Rights Allocations
- Load Share Allocation of ARRs by Load Zone
- Treatment of NEMA Contracts in ARR
- Treatment of Excepted Transactions in ARR
- Assumptions
- Auction, Forward Reserve
- Auction, FTR
- Auction, ICAP
- Average
B
C
- Calendar
- CELT
- Forecast Data
- Cooling and Heating Load Indexes for the Short-Run Peak Load Models
- Demand-Side Management for New England 1985-2015
- Demand-Side Management for the States 1985-2015
- ISO-NE Control Area & New England States Monthly Peak Load Forecast
- ISO-NE Control Area & New England States Net Energy for Load (NEL) & Seasonal Peak Load History
- ISO-NE Control Area Monthly Net Energy for Load History & Forecast
- ISO-NE Control Area Weather Normalized History & Forecast
- ISO-NE Control Area, States & Sub-areas Energy & Seasonal Peak Load - Forecast & High/Low Economic C
- ISO-NE Control Area, States, & Regional System Plan (RSP06) Sub-areas Energy and Seasonal Peak Load
- Operating Company Forecasts
- Proportion of Operating Company by Sub-Area
- Seasonal Peak Load Forecast Distributions for ISO-NE Control Area and New England States
- Short-Run Energy Model Drivers
- Short-Run Model Coefficients
- Short-Run Model Coefficients for the New England State Models
- State Long-Run Energy Model Economic/Demographic Variables 1980-2019
- Westinghouse Capacity Model Program Load Inputs (Power Years 2006/07-2014/15)
- Long-Run Forecast Report
- RSP Hourly Load Forecast
- Seasonal Peak Data
- Short-Run Forecast Report
- Sub-area Forecast Report
- Summer Normalization
- Winter Normalization
- Cleared
- Cleared Demand, Forecast Load, and Actual Load
- Demand, DA & RT Hourly
- Demand, DA Hourly
- Hub Cleared Demand, DA & RT Hourly
- Cold Weather
- Components of Day-Ahead Supply and Demand - Last 3 Months
- Components of Real-Time Supply and Demand - Last 3 Months
- Congestion
- Day-Ahead Congestion Component of LMP by Hour, Hub and Load Zones
- Designated Congestion Areas
- External Node, DA & RT Hourly
- Hub Node Congestion Component Frequency, Day-Ahead Market
- Hub Node Congestion Component Frequency, Real-Time Market
- Hub, DA & RT Hourly
- Load Zone, DA & RT Hourly
- Network Node, DA & RT Hourly
- Real-Time Congestion Component of LMP by Hour, Hub and Load Zones
- Congestion Revenue Summary
- Constraints
- Cost of Doing Business in New England
- Current
D
- Day-Ahead
- Components of Day-Ahead Supply and Demand - Last 3 Months
- Congestion Component of LMP by Hour, Hub and Load Zones
- Constraints, Hourly
- Demand Bid, Hourly
- Demand, Five-Minute
- Energy Offer Data, Hourly
- External Node, DA & RT Hourly
- Final LMPs, Hourly
- Hub Cleared Demand, DA & RT Hourly
- Hub Node, DA & RT Hourly
- Load Response Clearing Results, Hourly
- Load Response Offers, Hourly
- Load Zone LMPs, DA & RT Hourly
- Preliminary LMPs, Hourly
- Regulation Offer Data, Hourly
- Daily Summary Report - FTR Market
- Decrement Bids and Increment Offers
- Deficiency
- Degree Day Report, Monthly
- De-List
- Demand
- Average Hourly Bid-In, Cleared Fixed and Price Sensitive Demand, Virtual Demand and Virtual Suppl
- Bid, DA Hourly
- Cleared Fixed and Price Sensitive Demand, Virtual Demand and Virtual Supply
- Cleared, DA & RT Hourly
- Cleared, DA Hourly
- Daily Demand Bid and Virtual Volumes by Zone (MWh)
- Five-Minute DA
- Five-Minute RT
- Hub Cleared Demand, DA & RT Hourly
- Demand Response
- Designations
- Dispatchable vs. Non-Dispatchable Generation
E
- EEI, Hourly System Loads
- Emission Reports
- New England Marginal Emission Rate Analysis
- Regional Greenhouse Gas Initiative Impacts on the New England Power System
- Emergency Power Sales & Purchases
- Energy
- Daily Average Energy Price vs. Variable Production Costs
- Energy Offer Data, DA Hourly
- External Node
- Hub Energy, DA & RT Hourly
- Increment Offers and Decrement Bids
- Load Zone Energy, DA & RT Hourly
- Net Energy & Peak Load Report
- Network Load Energy, DA & RT Hourly
- New England, NY, PJM Weekly Average System Real-Time Energy Price
- Electric Quarterly Reporting (EQR), FERC
- Excepted Transactions, Treatment of in ARR
- External ICAP Import Rights Request Form
- External Node
F
- FA
- FCM
- FERC Electric Quarterly Reporting
- Final
- LMPs, DA Hourly
- Regulation Clearing Prices, RT Hourly
- Reserve Zone Designations, RT Hourly
- Reserve Zone Prices, Final DA Hourly
- Financial Assurance and Credit
- Financial Transmission Rights
- Auction
- Calendar
- Clearing Prices
- Long-Term FTR Auction Historical Bids
- Monthly FTR Auction Historical Bids
- Results
- Awarded MW-Months, Last 13 Monthly FTR Auctions
- Congestion Revenue Summary
- Daily Summary Report - FTR Market
- Interface Limits
- Long-Term FTR Auction Summary (in applicable months)
- Number of Auction Participants
- Reassignments
- Treatment of NEMA Contracts in ARR
- Treatment of Excepted Transactions in ARR
- Value of Monthly and Long-Term FTR Auctions, Last 13 Months
- Five-Minute (5-min)
- Ancillary Services Data, Current
- Demand, Five-Minute RT
- LMP, RT
- Marginal Prices, Current
- Regulation Clearing Prices
- Reserve Requirements, RT
- Reserve Zone Designations
- Forecast
- Forward Reserve
- Auction
- Composition of Forward Reserve Market Payments, Last 13 Mos.
- Forward Reserve Auction Offers
- Payments
- Payment Summary by Reserve Zone
- Real-Time On-Peak LMP vs. Forward Reserve Threshold Price, Last 13 Mos
- Fuel
G
- GADS
- Categories of NERC Class Average EFORd
- Processing Steps for GADS NxL Data Submission
- Report Descriptions
- Generation and Resources
- Annual Maintenance Schedule (AMS)
- Demand Response
- Dispatchable vs. Non-Dispatchable Generation
- Emission Reports
- New England Marginal Emission Rate Analysis
- Regional Greenhouse Gas Initiative Impacts on the New England Power System
- Interconnections
- Installed Capacity Requirements
- IC Requirements
- Reliability Agreements Information
- Seasonal Claimed Capability (SCC)
- GIS
- Greenhouse Gas Initiative Impacts on the New England Power System
H
- Heat Rate
- Historical
- Cleared Demand, DA Hourly
- Clearing Prices, DA Hourly
- Clearing Prices, Five-Minute RT
- Constraints, DA Hourly
- Degree Day Report, Monthly
- Demand Bid, DA Hourly
- Demand, DA Hourly
- Demand, Five-Minute RT
- Designations, Five-Minute RT
- Energy Offer Data, DA Hourly
- Final Constraints, RT Hourly
- Final LMPs, DA Hourly
- Final LMPs, RT Hourly
- Final Regulation Clearing Prices, RT Hourly
- Final Reserve Zone Designations, RT Hourly
- Final Reserve Zone Prices, DA Hourly
- LMP - Five-Minute RT
- LMP - Hourly DA
- Load Response Offers, DA Hourly
- Load Zone LMPs, DA & RT Hourly
- Net Energy & Peak Load Report
- Nodal Load Weights, Hourly
- OP4 Load Reconstitution, Hourly
- Preliminary Constraints, RT Hourly
- Preliminary LMPs, DA Hourly
- Preliminary LMPs, RT Hourly
- Preliminary Regulation Clearing Prices, RT
- Preliminary Reserve Zone Prices and Designations
- Regulation Offer Data, DA Hourly
- Reserve Requirements, Five-Minute RT
- Reserve Requirements, RT Hourly
- Reserve Zone, Five-Minute RT
- System Loads in EEI Format, Hourly
- Hourly
- Ancillary Services Data, Current
- Constraints, DA
- Constraints, Final RT
- Demand Bid, DA Hourly
- Demand, DA Cleared
- Energy Offer Data, DA
- LMPs, DA
- LMPs, DA Final
- LMPs, DA Preliminary
- Load Response Clearing Results, DA
- Load Response Offers, DA
- Nodal Load Weights, Hourly
- OP4 Load Reconstitution, Hourly
- Regulation Clearing Prices, DA
- Regulation Clearing Prices, RT Final
- Regulation Offer Data, DA
- Reserve Requirements, RT
- Reserve Zone Prices, Final DA
- Reserve Zone Prices, Preliminary DA
- System Loads in EEI Format, Hourly
- Zonal Information
- HQ Phase II Interconnection Capability Credit Procedures
- Hub
- Hub Node
I
- ICAP
- Annual System Peak, Day & Hour
- Auction Report
- Deficiency Auction Offers
- External ICAP Import Rights Request Form
- Forecasted Peak (MW)
- HQ Phase II Interconnection Capability Credit Procedures
- Import Rights
- Installed Capacity Requirements
- NERC Class Average EFORd Categories
- Requirement (MW)
- Reserve Margin (MW)
- Resource Form
- Seasonal Peak (MW)
- Sources of Installed Capacity by Type, 13 Mos.
- Supply Auction Offers & Bids
- Transition Period Settlement Summary
- Import
- Increment
- Interface Limits
- Interchange Data
- External Transaction Real-Time Schedule Data
- External Interface Metered Data
- Pre-SMD Net Interchange
- Pre Markets Net Interchange
- Real-Time Interchange Data
- SMD Interchange
- Interconnections
- ISO Express
J
K
L
- Limit
- LMP
- 28-Day Rolling Average LMP Deviation
- Average DA and Real-Time LMPs at the Hub, Weekly
- Average Hourly Bid-In, Cleared Fixed and Price Sensitive Demand, Virtual Demand and Virtual Supply
- Average LMPs and Components
- Components by Location
- DA vs. RT LMPs ($/MWh)
- Distribution, DA LMP Frequency
- External Node, DA & RT Hourly
- Final LMPs, DA Hourly
- Final LMPs, DA Hourly
- Frequency Distribution, RT LMP
- Graphs, Day-Ahead Market, 13 Months
- Graphs, Real-Time Market, 13 Months
- Hourly New England, NY, PJM Day-Ahead System Energy Price
- Hub and External Nodes, Hourly Day-Ahead
- Hub and External Nodes, Hourly Real-Time
- Hub and Load Zones, Hourly Day-Ahead LMPs
- Hub and Load Zones, Hourly Real-Time
- Hub Node Congestion Component Frequency, Day-Ahead Market
- Hub Node Congestion Component Frequency, Real-Time Market
- Hub Node, DA & RT Hourly
- Hub, DA & RT Hourly
- Load Zone, DA & RT Hourly
- New England, NY, PJM Real-Time System Energy Price, Hourly
- New England, NY, PJM Weekly Average System Real-Time Energy Price
- New England, NY, PJM Weekly Average System Real-Time Energy Price
- Peak Hour System Load and Associated Hourly LMPs, Real-Time
- Preliminary LMPs, DA Hourly
- Preliminary LMPs, RT Hourly
- Real-Time Congestion Component of LMP by Hour, Hub and Load Zones
- Real-Time Peak Hour System Load and Associated Hourly LMPs
- Summary Statistics
- Summary Statistics - All Hours, On-Peak, Off-Peak
- Weekly Average DA and Real-Time LMPs at the Hub
- Load
- Load Forecast
- Load Obligation
- DA Load Obligation Percent of RT Load Obligation
- Day-Ahead load obligation vs. Real-Time Load Obligation by Load Zone
- Load Response
- Load Zone
- Cleared Demand, DA & RT Hourly
- Congestion, DA & RT Hourly
- Daily Summary of Hourly Data
- Energy, DA & RT Hourly
- LMPs, DA & RT Hourly
- Loss, DA & RT Hourly
- Monthly Summary of Hourly Data
- Long Term Outage Report
- Loss
M
- Marginal Prices (Provisional)
- Marginal Loss Revenue Fund by Month, 13 Mos.
- Market External Interface Summary
- Market Mitigation
- Monthly
- Average DA Congestions vs. Monthly FTR Cost
- Average DA Congestions vs. Monthly FTR Cost, Last 13 months
- Average Fuel Price and RT Hub LMP Indexes
- Average of Hourly Regulation Market Clearing Price, Last 13 Months
- Average Regulation Market Clearing Prices, Last 13 Months
- Degree Day Report
- Delisted Capacity, Month
- FTR Auction Results, Last 13 Months
- Monthly and Long-Term FTR Auctions, Overall, On-Peak and Off-Peak Aggregate Cost to Procure
- Monthly FTR Auction Summary
- Monthly FTR Auction, Auction Dollars, Buy/Sell, Bid and Cleared, 13 Months
- Monthly FTR Auction, MW-Months, Buy/Sell, Bid and Cleared, 13 Months
- Monthly FTR Auction, Number of Bids, Buy/Sell, Bid and Cleared, 13 Months
- Monthly Market Summary
- Monthly Market Performance Reports
- Morning Report
N
- NEMA
- NERC Class Average EFORd Categories
- Net Energy & Peak Load Report
- Net Interchange
- DA vs. RT Net Interchange, This Year vs. Last
- Net Interchange Summary by Interface, Day-Ahead and Real-Time Market
- Net Interchange Summary by Interface, Last 13 Months
- Network Node
- NCPC and Operating Reserve
- 2nd Contingency Reliability Payments (NCPC) by Reliability Region
- Day-Ahead Reliability Payments (NCPC) by Day
- Increment Offers and Decrement Bids
- NCPC Allocation Factors
- NCPC and Pricing Highlights
- Payment Rates by Reliability Region and Unit, Second Contingency NCPC
- Payment Rates by Reliability Region, Second Contingency NCPC
- Payments By Reliability Region
- Payments by Reliability Region, DA and RT NCPC
- Payments by Reliability Region, Last 13 Months, DA and RT NCPC
- Payments (NCPC) by Day, Real-Time Reliability
- Payments By Type
- Payments by Type and Percent of Energy Market
- Payments by Type and Region, DA NCPC
- Payments by Type and Region, Real-Time NCPC
- Payments by Type and Region, RT NCPC
- Payments, Day-Ahead and Real-Time NCPC
- Payments, First Contingency
- Payments, Second Contingency NCPC
- PUSH Unit Summary
- Reliability Payments (NCPC) by Day, Real-Time
- Summary, Monthly
- Transmission Related Commitment and NCPC Reporting
- Voltage and Distribution NCPC Payments
- Year-Over-Year Total NCPC Dollars
- Zonal Decrement Bids and Cleared Amounts
- Zonal Increment Offers and Cleared Amounts
- Nodal Load Weights, Hourly
O
P
- Path Names with Corresponding PORs and PODs under SMD
- Peak
- Demand (Peak Data Summary)
- ICAP Annual System Peak, Day & Hour
- ICAP Forecasted Peak (MW)
- ICAP Seasonal Peak (MW)
- Load Report & Net Energy
- Real-Time Peak Hour System Load and Associated Hourly LMPs
- PNODE Table
- Pool Congestion Charges - CRF
- Preliminary
- LMPs, RT Hourly
- LMPs, DA Hourly
- Regulation Clearing Prices, Five-Minute RT
- Reserve Zone Prices, DA Hourly
- Pre SMD
- Energy Bids
- Historical Market Bid Data
- Hourly Historical Data Post-Market
- Hourly Historical Data Pre-Market
- ICAP
- Reserves & AGC Bids
- PTF
- Prices
Q
R
- Rates
- Real Time (RT)
- Components of Real-Time Supply and Demand - Last 3 Months
- Constraints, Final RT Hourly
- Constraints, Preliminary Hourly
- External Node, DA & RT Hourly
- Hub Cleared Demand, DA & RT Hourly
- Hub Node, DA & RT Hourly
- LMP, Five-Minute
- Load Zone LMPs, DA & RT Hourly
- Regulation Clearing Prices, Final Hourly
- Regulation Clearing Prices, Five-Minute
- Regulation Clearing Prices, Preliminary
- Reserve Price Frequency, Real-Time
- Reserve Requirements, Five-Minute
- Reserve Requirements, Hourly
- Reserve Zone Designations, Five-Minute
- Reserve Zone Prices, Five-Minute
- Reserve Zone Prices, Preliminary Hourly
- Reconstitution
- Regulation
- Clearing Prices, DA Hourly
- Clearing Prices, Final RT Hourly
- Clearing Prices, Five-Minute RT
- Clearing Prices, Preliminary RT
- Components of Monthly Regulation Market Cost, Last 13 Months
- Daily Regulation Requirement
- Offer Data, DA Hourly
- Regulation Selector Tuning Parameters
- Reliability
- Day-Ahead Reliability Payments (NCPC) by Day
- Payments (NCPC) by Day, Real-Time Reliability
- Reliability Agreements
- Requests for Reliability Determinations
- Reserve
- Clearing Prices, Real-Time Reserve
- Payment Summary by Reserve Zone, Real-Time Reserve
- Real-Time On-Peak LMP vs. Forward Reserve Threshold Price, Last 13 Mos
- Real-Time Reserve Payment Summary by Reserve Zone
- Reserve Market Results
- Reserve Requirements
- Reserve Zone
- Designations, Final RT Hourly
- Designations, Five-Minute RT
- FRM Payment Summary by Reserve Zone
- Prices, Final DA Hourly
- Prices, Five-Minute RT
- Prices, RT Preliminary
- Requirements, ICAP (MW)
- RNS Transmission Rates
- Rolling Average LMP Deviation, 28-Day
S
- Seasonal Claimed Capability (SCC)
- Second Contingency
- Second Contingency NCPC Payment Rates by Reliability Region
- Second Contingency NCPC Payment Rates by Reliability Region and Unit
- Second Contingency NCPC Payments
- Settlements
- Bill
- Day Ahead Market Settlement Status Report
- Forward Reserve Market Payments
- FRM Payment Summary by Reserve Zone
- NCPC
- DA and RT NCPC Payments by Reliability Region
- DA and RT NCPC Payments by Reliability Region, Last 13 Months
- Day-Ahead and Real-Time NCPC
- First Contingency Payments
- Payments By Reliability Region
- Payments By Type
- Payments by Type and Percent of Energy Market
- Payments by Type and Region, Real-Time NCPC
- Payments by Type and Region, RT NCPC
- Payment Rates by Reliability Region, Second Contingency NCPC
- Payment Rates by Reliability Region and Unit, Second Contingency NCPC
- Payments, Second Contingency NCPC
- Voltage and Distribution NCPC Payments
- Year-Over-Year Total NCPC Dollars
- Real Time Market Settlement Status Report
- Settlement Model
- Short Term Outage Report
- Status Reports
- System Loads in EEI Format, Hourly
- System Operations
T
- Tariff
- Blackstart Settlement Reports
- ISO Tariff Rates
- OATT Schedule 1 Rate Development Worksheet
- OATT Schedule 16 - Black Start
- OATT Schedule 2 - VAR
- OATT Schedule 9 Rate Development Supporting Documents
- OATT Schedule 9 Rate Development Worksheet
- Rate Development Supporting Documents
- Regional RMR Summary Report
- RNS Support Documents for ROE Settlements
- ROE Interest Calculation Methodology
- ROE Resettlement Details
- Tariff - Monthly Regional Network Service Settlement
- Tariff Settlement Report
- TOUT Support Documents for ROE Settlements
- VAR Settlements Report
- VAR Settlements Supporting Reports
- VAR Status Reports
- Threshold Price, Forward Reserve
- Transition Period Settlement Summary
- Transmission
- Long Term Outage Report
- New England Power Pool Transmission Facilities
- New England Single-Source Contingency
- OASIS
- Transmission Path Names with Corresponding PORs and PODs under SMD
- Path Names with Corresponding PORs and PODs under SMD
- RNS and TOut Transmission Rates
- Short Term Outage Report
- Total Transfer Capability (TTC)
- TOUT Transmission Rates
- TTC
U
V
X

