Schedule 23 - Standard Small Generator Interconnection Procedures
Provides the terms and conditions for interconnecting Small Generating Facilities (20 MW or less) to the Administered Transmission System.
| Date | Document Title | Document Type | |
| Dec 01, 2008 | PDF (744k) | ||

