Schedule 22 - Standard Large Generator Interconnection Procedures
Provides the terms and conditions for interconnecting Large Generating Facilities (more than 20 MW) to the Administered Transmission System.
| Date | Document Title | Document Type | |
| Dec 01, 2008 | PDF (1.1Mb) | ||

