ICAP
Under Installed Capacity (ICAP), generators are paid for siting units in New England based on the net capacity the unit provides after adjustments to account for forced outages at the unit. The adjusted product is called Unforced Capacity, or UCAP.
Date Document Title Document Type
Mar 30, 2010
Summary, by month, of the amount of available Import Rights for Installed Capacity (ICAP) on each of the external import interfaces. The spreadsheet will be updated periodically to reflect ICAP import rights availability
XLS (65.5k)
Mar 02, 2010
ISO New England Annual System Peak Day, Hour & Load MW
XLS (106k)
Jun 04, 2009
A summary of the Forcasted Peak Loads, Installed Capacity Requirements and Reserve Margins for the Power Year June 1, 2009 through May 31, 2010.
PDF (27.8k)
Jun 02, 2008
A summary of the Forcasted Peak Loads, Installed Capacity Requirements and Reserve Margins for the Power Year June 1, 2008 through May 31, 2009.
PDF (20.9k)
Jun 19, 2007
A summary of the Forcasted Peak Loads, Installed Capacity Requirements and Reserve Margins for the Power Year June 1, 2007 through May 31, 2008.
PDF (20.1k)
May 30, 2007
This document describes procedures associated with Hydro Quebec Interconnection Credits (HQICCs) for the 2007 - 2008 Power Year - how HQICCs are assigned and, if necessary, adjusted.
DOC (77k)
  Copyright ©2010 ISO New England Inc.