Relevant Documentation
Additional documents associated with the Forward Capacity Market.

Date Document Title Document Type  
Jan 18, 2012
The Adjustment to CONE for FCA 6 using the Handy-Whitman Index
PDF (189k)
Jan 18, 2012
The Adjustment to the Qualification Thresholds for FCA 6 using the Handy-Whitman Index
PDF (183k)
Jan 04, 2012 PDF (189k)
Jul 08, 2011
Pricing thresholds to be used for the Foward Capacity Auction (FCA)
PDF (148k)
Feb 22, 2011
The values used in calculating a load serving entity's projected share of the Installed Capacity Requirement per Capacity Zone for the Capacity Commitment Period beginning June 2014.
DOC (79.5k)
Nov 08, 2010
The calculation of CONE for FCA 5 based on the Handy-Whitman Index of Public Utility Construction Costs
PDF (315k)
Oct 25, 2010
List of FCA 2013-2014 Auction Cleared Delist Bids
XLSX (385k)
Jul 13, 2010 XLS (173k)
Apr 09, 2010
The values used in calculating a load serving entity's projected share of the Installed Capacity Requirement per Capacity Zone for the Capacity Commitment Period beginning June 2013.
PDF (38.0k)
Jan 26, 2010
The document shows the updated CELT Primary Fuel Type for those resources associated with FCM Maintenance Allotments.
XLS (77k)
Dec 09, 2009
List of FCA 2012-2013 Auction Cleared Delist Bids
XLS (76.5k)
Nov 25, 2009
ISO-NE Memorandum stating the FCM maintenance allotment values for the first two Capacity Commitment Periods (FCA_2010_2011 and FCA_2011_2012)
PDF (60.4k)
Oct 02, 2009
ISO-NE Memorandum stating the FCM maintenance allotment values for the June 1, 2012 through May 31, 2013 Capacity Commitment Period (FCA_2012_2013).
PDF (86.8k)
Aug 14, 2009
The draft agreement was created for the sole purpose of assisting NEPOOL existing and future Participants in creating bilateral Composite Offers for the Forward Capacity Market (FCA).
DOC (158k)
Aug 14, 2009
The document is a model agreement created for the sole purpose of assisting NEPOOL existing and future Participants in creating bilateral arrangements in the Forward Capacity Market (FCA).
DOC (133k)
Jun 02, 2009
The values used in calculating a load serving entity's projected share of the Installed Capacity Requirement per Capacity Zone for the Capacity Commitment Period beginning June 2012.
PDF (48.6k)
May 04, 2009
The qualified MW vaules contained in the FERC Informational Filing for Capacity Committment Period 2010-2011 plus additional fields (location and resource sub-type).
XLS (663k)
May 04, 2009
The qualified MW vaules contained in the FERC Informational Filing for Capacity Committment Period 2011-2012 plus additional fields (location and resource sub-type).
XLS (213k)
Sep 16, 2008
Excel version of Attachment tables included with the FCA-2 FERC Informational Filing made on September 9, 2008
XLS (168k)
Jul 28, 2008
Forward Capacity Market Asset to Exemption Hour Group Mapping Documentation
PDF (298k)
Jul 21, 2008
The values used in calculating a load serving entity's projected share of the Installed Capacity Requirement per Capacity Zone for the Capacity Commitment Period beginning June 2011
PDF (39.3k)
Apr 17, 2008
Results including expanded data (Locational information and Demand Resource Type) from the FERC filing.
XLS (752k)
Apr 07, 2008
FCA 2010 2011 Results FERC Filing (List of Submitted De-List Bids)
XLS (75k)
Mar 11, 2008
FCA 2010 2011 Results FERC Filing (Monthly MW Obligation by Capacity Resource from June 1, 2010 through May 31, 2011)
XLS (512k)
Feb 14, 2008
Cost of New Entry (CONE) and Reserve Margin used for the Forward Capacity Auction for the Capacity Commitment Period of June 1, 2011 to May 31, 2012 (FCA_2011_2012)
PDF (41.9k)
Nov 28, 2006
Draft version
PDF (139k)
  Copyright ©2012 ISO New England Inc.