Reliability Committee Materials
Jan 17, 2012
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.
| Date |
Document Title |
Document Type |
|
| Jan 16, 2012 |
January 17, 2012 RC Agenda |
 |
DOC (79.5k) |
| Jan 17, 2012 |
January 17, 2012 RC Motions Letter revised to reflect the addition of voting items 5.1 - Holyoke 6/Cabot 6 NPR and item 5.2 - Holyoke 8/Cabot 8 NPR |
 |
DOC (63k) |
| Jan 13, 2012 |
December 13, 2011 RC Meeting Minutes |
 |
DOC (118k) |
| Jan 11, 2012 |
Pawtucket Power Holdings and NU's Level III PPAs for the Altresco Generator & SPS Modification Project as covered in PPHC-12-G01 and NU-12-X01. CEII Materials |
 |
ZIP (1.9Mb) |
| Jan 13, 2012 |
UI's 8300 Reconfiguration Project Level III PPAs as covered in UI-12-T01, UI-12-T02, and UI-12-T03. CEII Materials |
 |
ZIP (2.7Mb) |
| Jan 12, 2012 |
Highland Wind and CMPs Level III PPAs for the Highland Wind Generation and Transmission Project as covered in HW-12-G01, HW-12-T01 and CMP-11-T04. CEII Materials |
 |
ZIP (2.7Mb) |
| Jan 12, 2012 |
CTMEEC's South Norwalk Substation Project Level III PPA as covered in CTMEEC-11-T01. CEII Materials |
 |
ZIP (11.1Mb) |
| Jan 11, 2012 |
NSTAR's Kingston Wind Level 0 PPA as covered in NSTAR-11-G16. CEII Materials |
 |
ZIP (975k) |
| Jan 11, 2012 |
NSTAR's Fairhaven Wind Project Level 0 PPA as covered in NSTAR-11-G07. CEII Materials |
 |
ZIP (762k) |
| Jan 11, 2012 |
|
 |
ZIP (62.4k) |
| Jan 11, 2012 |
|
 |
ZIP (62.4k) |
| Jan 11, 2012 |
|
 |
XLS (23k) |
| Jan 11, 2012 |
|
 |
XLS (41.5k) |
| Jan 11, 2012 |
|
 |
XLS (41.5k) |
| Jan 11, 2012 |
|
 |
XLS (41.5k) |
| Jan 11, 2012 |
|
 |
XLS (41.5k) |
| Jan 11, 2012 |
|
 |
XLS (41.5k) |
| Jan 11, 2012 |
|
 |
XLS (41k) |
| Jan 11, 2012 |
OP 5D - Generator and Dispatchable Asset Related Demand Maintenance and Outage Scheduling – Appendix D – Demand Response Activation Analysis |
 |
ZIP (130k) |
| Jan 11, 2012 |
OP 6A - System Restoration – Appendix A - System Restoration Guidelines |
 |
ZIP (354k) |
| Jan 11, 2012 |
OP 6D - System Restoration – Appendix D – Inter Local Control Center Ties Operating at 115 kV and Above |
 |
ZIP (356k) |
| Jan 11, 2012 |
|
 |
PPTX (240k) |