Reliability Committee Materials
Jan 17, 2012
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.

Date Document Title Document Type  
Jan 16, 2012
January 17, 2012 RC Agenda
DOC (79.5k)
Jan 17, 2012
January 17, 2012 RC Motions Letter revised to reflect the addition of voting items 5.1 - Holyoke 6/Cabot 6 NPR and item 5.2 - Holyoke 8/Cabot 8 NPR
DOC (63k)
Jan 13, 2012
December 13, 2011 RC Meeting Minutes
DOC (118k)
Jan 11, 2012
Pawtucket Power Holdings and NU's Level III PPAs for the Altresco Generator & SPS Modification Project as covered in PPHC-12-G01 and NU-12-X01. CEII Materials
ZIP (1.9Mb)
Jan 13, 2012
UI's 8300 Reconfiguration Project Level III PPAs as covered in UI-12-T01, UI-12-T02, and UI-12-T03. CEII Materials
ZIP (2.7Mb)
Jan 12, 2012
Highland Wind and CMPs Level III PPAs for the Highland Wind Generation and Transmission Project as covered in HW-12-G01, HW-12-T01 and CMP-11-T04. CEII Materials
ZIP (2.7Mb)
Jan 12, 2012
CTMEEC's South Norwalk Substation Project Level III PPA as covered in CTMEEC-11-T01. CEII Materials
ZIP (11.1Mb)
Jan 11, 2012
NSTAR's Kingston Wind Level 0 PPA as covered in NSTAR-11-G16. CEII Materials
ZIP (975k)
Jan 11, 2012
NSTAR's Fairhaven Wind Project Level 0 PPA as covered in NSTAR-11-G07. CEII Materials
ZIP (762k)
Jan 11, 2012 ZIP (62.4k)
Jan 11, 2012 ZIP (62.4k)
Jan 11, 2012 XLS (23k)
Jan 11, 2012 XLS (41.5k)
Jan 11, 2012 XLS (41.5k)
Jan 11, 2012 XLS (41.5k)
Jan 11, 2012 XLS (41.5k)
Jan 11, 2012 XLS (41.5k)
Jan 11, 2012 XLS (41k)
Jan 11, 2012
OP 5D - Generator and Dispatchable Asset Related Demand Maintenance and Outage Scheduling – Appendix D – Demand Response Activation Analysis
ZIP (130k)
Jan 11, 2012
OP 6A - System Restoration – Appendix A - System Restoration Guidelines
ZIP (354k)
Jan 11, 2012
OP 6D - System Restoration – Appendix D – Inter Local Control Center Ties Operating at 115 kV and Above