| May 20, 2010 |
May 24, 2010 RC Motions Letter |
 |
DOC (55.5k) |
| May 20, 2010 |
PP 10 - Planning Procedure to Support the Forward Capacity Market |
 |
DOC (1.1Mb) |
| May 18, 2010 |
PP 4 - Procedure for Pool Supported PTF Cost Review |
 |
PPT (664k) |
| May 18, 2010 |
PP 7 - Procedure for Determining and Implementing Transmission Facility Ratings in New England |
 |
PPT (650k) |
| May 18, 2010 |
Level I PPA from NGRID for the West Warwick Substation Project |
 |
PDF (370k) |
| May 18, 2010 |
Level I PPA from NSTAR for the Balboni Wind Project |
 |
ZIP (579k) |
| May 18, 2010 |
Level I PPA from NSTAR for the Cross Road Substation Upgrade Project |
 |
ZIP (251k) |
| May 18, 2010 |
Level I PPA from NSTAR for the Woburn Station 211 Circuit Switcher and Breaker Replacement Project |
 |
ZIP (432k) |
| May 18, 2010 |
Level I PPA submitted by UI for the West River 115 kV Circuit Breaker Additions & Replacement Project |
 |
ZIP (162k) |
| May 18, 2010 |
OP 4 Event Summary from 03/14/2010 and 05/02/2010 and Frequence Excursions |
 |
PPT (684k) |
| May 18, 2010 |
RC Meeting Minutes (draft) for 01/19/2010, 01/20/2010, 03/17/2010, 03/22/2010, 04/26/2010, 04/29/2010 |
 |
ZIP (131k) |
| May 18, 2010 |
Dartmouth CT #3 (Asset ID#15940) Schedule 2 CC Compensation Request |
 |
ZIP (1.1Mb) |
| May 18, 2010 |
TCA from NGRID for the E205E Refurbishment Project |
 |
ZIP (1.7Mb) |
| May 18, 2010 |
Level III PPA from Iberdrola Renewables and VELCO for the Deerfield Wind Generator and Transmission Project |
 |
ZIP (4.6Mb) |
| May 18, 2010 |
Level III PPA from First Winad and CMP for the Longfellow Wind Generator and Transmission project |
 |
ZIP (4.8Mb) |
| May 20, 2010 |
Level III PPA from MMWEC for the Stony Brook Generator and Transmission Project |
 |
ZIP (5.7Mb) |
| May 18, 2010 |
Compliance Matters regarding NERC/NPCC and ISO-NE initiatives. |
 |
ZIP (161k) |
| May 18, 2010 |
ISO-NE recommended Maintenance Allotment Values for 4th FCM Capacity Commitment Period |
 |
PPT (490k) |
| May 20, 2010 |
|
 |
DOC (348k) |
| May 18, 2010 |
OP 6C System Restoration - Charging of 345 kV Circuits in New England |
 |
ZIP (319k) |
| May 18, 2010 |
OP 12 - Voltage and Reactive Control |
 |
ZIP (301k) |
| May 18, 2010 |
OP 12B - Voltage and Reactive Control - Voltage and Reactive Schedules and Surveys |
 |
ZIP (1.9Mb) |
| May 18, 2010 |
OP 13, 13B, & 13 C - Standards for Voltage Reduction and Load Shedding Capability |
 |
ZIP (1.2Mb) |