Reliability Committee Materials
May 24, 2010
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
May 20, 2010
May 24, 2010 RC Motions Letter
DOC (55.5k)
May 20, 2010
PP 10 - Planning Procedure to Support the Forward Capacity Market
DOC (1.1Mb)
May 18, 2010
PP 4 - Procedure for Pool Supported PTF Cost Review
PPT (664k)
May 18, 2010
PP 7 - Procedure for Determining and Implementing Transmission Facility Ratings in New England
PPT (650k)
May 18, 2010
Level I PPA from NGRID for the West Warwick Substation Project
PDF (370k)
May 18, 2010
Level I PPA from NSTAR for the Balboni Wind Project
ZIP (579k)
May 18, 2010
Level I PPA from NSTAR for the Cross Road Substation Upgrade Project
ZIP (251k)
May 18, 2010
Level I PPA from NSTAR for the Woburn Station 211 Circuit Switcher and Breaker Replacement Project
ZIP (432k)
May 18, 2010
Level I PPA submitted by UI for the West River 115 kV Circuit Breaker Additions & Replacement Project
ZIP (162k)
May 18, 2010
OP 4 Event Summary from 03/14/2010 and 05/02/2010 and Frequence Excursions
PPT (684k)
May 18, 2010
RC Meeting Minutes (draft) for 01/19/2010, 01/20/2010, 03/17/2010, 03/22/2010, 04/26/2010, 04/29/2010
ZIP (131k)
May 18, 2010
Dartmouth CT #3 (Asset ID#15940) Schedule 2 CC Compensation Request
ZIP (1.1Mb)
May 18, 2010
TCA from NGRID for the E205E Refurbishment Project
ZIP (1.7Mb)
May 18, 2010
Level III PPA from Iberdrola Renewables and VELCO for the Deerfield Wind Generator and Transmission Project
ZIP (4.6Mb)
May 18, 2010
Level III PPA from First Winad and CMP for the Longfellow Wind Generator and Transmission project
ZIP (4.8Mb)
May 20, 2010
Level III PPA from MMWEC for the Stony Brook Generator and Transmission Project
ZIP (5.7Mb)
May 18, 2010
Compliance Matters regarding NERC/NPCC and ISO-NE initiatives.
ZIP (161k)
May 18, 2010
ISO-NE recommended Maintenance Allotment Values for 4th FCM Capacity Commitment Period
PPT (490k)
May 20, 2010 DOC (348k)
May 18, 2010
OP 6C System Restoration - Charging of 345 kV Circuits in New England
ZIP (319k)
May 18, 2010
OP 12 - Voltage and Reactive Control
ZIP (301k)
May 18, 2010
OP 12B - Voltage and Reactive Control - Voltage and Reactive Schedules and Surveys
ZIP (1.9Mb)
May 18, 2010
OP 13, 13B, & 13 C - Standards for Voltage Reduction and Load Shedding Capability
ZIP (1.2Mb)
  Copyright ©2012 ISO New England Inc.