Reliability Committee Materials
Jun 18, 2010
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
Jun 14, 2010
June 18, 2010 RC Agenda revised to reflect break out of Agedna Item 4 Simulation Model for ICR Calculations (GE MARS versus Westinghouse)
DOC (57k)
Jun 15, 2010
ISO-NE Operations Perspection on New England Tie Benefits
PPT (1.7Mb)
Jun 14, 2010
ISO-NE Tie Benefits Calculation Methodology Proposal
PPT (1.7Mb)
Jun 14, 2010
Simulation Model for Installed Capacity Requirements Calculations. GE Mars versus Westinghouse
PPT (325k)
Jun 14, 2010
LIPA and Cross Sound Cable Tie Benefits Proposal
PPT (948k)
Jun 16, 2010
Northeast Utilities Tie Benefits Proposal
PPT (19k)
  Copyright ©2012 ISO New England Inc.