Reliability Committee Materials
Jun 18, 2010
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.
| Date |
Document Title |
Document Type |
| Jun 14, 2010 |
June 18, 2010 RC Agenda revised to reflect break out of Agedna Item 4 Simulation Model for ICR Calculations (GE MARS versus Westinghouse) |
 |
DOC (57k) |
| Jun 15, 2010 |
ISO-NE Operations Perspection on New England Tie Benefits |
 |
PPT (1.7Mb) |
| Jun 14, 2010 |
ISO-NE Tie Benefits Calculation Methodology Proposal |
 |
PPT (1.7Mb) |
| Jun 14, 2010 |
Simulation Model for Installed Capacity Requirements Calculations. GE Mars versus Westinghouse |
 |
PPT (325k) |
| Jun 14, 2010 |
LIPA and Cross Sound Cable Tie Benefits Proposal |
 |
PPT (948k) |
| Jun 16, 2010 |
Northeast Utilities Tie Benefits Proposal |
 |
PPT (19k) |