Reliability Committee Materials
June 14, 2010
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
Jun 08, 2010
June 14, 2010 RC Agenda revised to reflect addition of Notis Wind I Level 0 Generator PPA (agenda item 5-1)
DOC (71k)
Jun 08, 2010
June 14, 2010 RC Motions Letter
DOC (69.5k)
Jun 11, 2010
RC Meeting Minutes from 12/15/2009, 12/21/2009, 01/19/2010, 01/20/2010, 03/17/2010, 03/22/2010, 04/26/2010, 04/29/2010
ZIP (170k)
Jun 10, 2010
Level III PPA from MMWEC for Stony Brook Generator and Transmission Project. Additional Materials added for clean and red lines versions of project reports and revised PPAs and one line diagram.
ZIP (3.3Mb)
Jun 08, 2010
Level III PPA from NU for the Palmer Renewable Generator and Transmission Project
ZIP (4.2Mb)
Jun 08, 2010
Level III PPA from ECO Industries for the Spruce Mountain Wind Generator Project
ZIP (993k)
Jun 08, 2010
Level 0 PPA submitted by NSTAR for the Notis Wind I Generator Project
ZIP (429k)
Jun 08, 2010
ISO-NE recommended Maintenance Allotment Values for 4th and 5th Capacity Committment Period
PPT (486k)
Jun 10, 2010
PP 5-1 Procedure for Review of Governance Participants Proposed Plans (Section I.3.9 Applications : Requirements, Procedures and Forms)
ZIP (209k)
Jun 08, 2010
PP 10 - Planning Procedure to Support the Forward Capacity Market
ZIP (640k)
Jun 09, 2010
PP 4 - Procedure for Pool Supported PTF Cost Review
DOC (116k)
Jun 08, 2010
PP 7 - Procedure for Determining and Implementing Transmission Facility Ratings in New England
ZIP (233k)
Jun 08, 2010
May 26, 2010 OP 4 Event Summary
PPT (1020k)
  Copyright ©2012 ISO New England Inc.