Reliability Committee Materials
Jul 19, 2010
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
Jul 13, 2010
July 19, 2010 RC Motions Letter
DOC (50k)
Jul 16, 2010
July 19, 2010 RC Agenda revised to reflect change in agenda items 6.1 and 6.2 from Future Vote to Vote
DOC (73.5k)
Jul 13, 2010
Reliability Committee Meeting Minutes from May 24, 2010 and June 14, 2010
ZIP (48.6k)
Jul 13, 2010
OP 18C redline document reflecting edits from OP 18 Working Group
DOC (71k)
Jul 13, 2010
Level III PPA from NU for the Greater Nashua/Manchester Area Transmission Project
ZIP (1.4Mb)
Jul 19, 2010
UI Proposed Plan Application for the Milford Fuel Cell Project. Materials revised to reflect addition of updated study report.
ZIP (424k)
Jul 13, 2010
Level I PPA from First Light Power Resources for the Waterbury generator capacity increase.
ZIP (162k)
Jul 13, 2010
Level I PPA from NU for the Bradley Energy Center generator addition.
ZIP (335k)
Jul 13, 2010
TCA from NU for the Three Rivers Switching Station
ZIP (247k)
Jul 16, 2010
TCA from NU for the 310/368 DCT Separation
ZIP (115k)
Jul 14, 2010
PP4 Procedure for Pool Supported PTF Cost Review
ZIP (668k)
Jul 13, 2010
PP 5-6 Scope of Study for System Impact Studies Under the Generator Interconnection Procedures
ZIP (29.2k)
Jul 13, 2010
PP 7 Procedure for Determining and Implementing Transmission Facility Ratings in New England
PPT (741k)
Jul 14, 2010 PPT (3.8Mb)
Jul 18, 2010
OP 4 Event Summary for June 24, 2010 and July 5, 2010
PPT (1.1Mb)
  Copyright ©2012 ISO New England Inc.