Reliability Committee Materials
Jul 19, 2010
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.
| Date |
Document Title |
Document Type |
| Jul 13, 2010 |
July 19, 2010 RC Motions Letter |
 |
DOC (50k) |
| Jul 16, 2010 |
July 19, 2010 RC Agenda revised to reflect change in agenda items 6.1 and 6.2 from Future Vote to Vote |
 |
DOC (73.5k) |
| Jul 13, 2010 |
Reliability Committee Meeting Minutes from May 24, 2010 and June 14, 2010 |
 |
ZIP (48.6k) |
| Jul 13, 2010 |
OP 18C redline document reflecting edits from OP 18 Working Group |
 |
DOC (71k) |
| Jul 13, 2010 |
Level III PPA from NU for the Greater Nashua/Manchester Area Transmission Project |
 |
ZIP (1.4Mb) |
| Jul 19, 2010 |
UI Proposed Plan Application for the Milford Fuel Cell Project. Materials revised to reflect addition of updated study report. |
 |
ZIP (424k) |
| Jul 13, 2010 |
Level I PPA from First Light Power Resources for the Waterbury generator capacity increase. |
 |
ZIP (162k) |
| Jul 13, 2010 |
Level I PPA from NU for the Bradley Energy Center generator addition. |
 |
ZIP (335k) |
| Jul 13, 2010 |
TCA from NU for the Three Rivers Switching Station |
 |
ZIP (247k) |
| Jul 16, 2010 |
TCA from NU for the 310/368 DCT Separation |
 |
ZIP (115k) |
| Jul 14, 2010 |
PP4 Procedure for Pool Supported PTF Cost Review |
 |
ZIP (668k) |
| Jul 13, 2010 |
PP 5-6 Scope of Study for System Impact Studies Under the Generator Interconnection Procedures |
 |
ZIP (29.2k) |
| Jul 13, 2010 |
PP 7 Procedure for Determining and Implementing Transmission Facility Ratings in New England |
 |
PPT (741k) |
| Jul 14, 2010 |
|
 |
PPT (3.8Mb) |
| Jul 18, 2010 |
OP 4 Event Summary for June 24, 2010 and July 5, 2010 |
 |
PPT (1.1Mb) |