Reliability Committee Materials
Aug 25, 2010
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.
| Date |
Document Title |
Document Type |
| Aug 18, 2010 |
August 25, 2010 RC Tie Benefits Agenda |
 |
DOC (28k) |
| Aug 24, 2010 |
Supporting presentation to ISO-NE Operations Perspective on Tie Benefits Calculation Methodology |
 |
PPT (739k) |
| Aug 24, 2010 |
|
 |
PPT (1.4Mb) |
| Aug 23, 2010 |
Presentation is same as provided to the RC at the July 20, 2010 meeting. Exception is slide #3, which has been updated. |
 |
PPT (364k) |
| Aug 24, 2010 |
Mass AG presentation regarding an alternative Tie Benefits proposal pertaining to "As Is' versus "At Criteria" |
 |
PPT (265k) |
| Aug 23, 2010 |
Tie Benefits Calculation Methodology using "As Is" versus 'At Criteria" System Conditions |
 |
PPT (1.0Mb) |
| Aug 24, 2010 |
|
 |
DOC (66.5k) |