Reliability Committee Materials
Aug 25, 2010
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
Aug 18, 2010
August 25, 2010 RC Tie Benefits Agenda
DOC (28k)
Aug 24, 2010
Supporting presentation to ISO-NE Operations Perspective on Tie Benefits Calculation Methodology
PPT (739k)
Aug 24, 2010 PPT (1.4Mb)
Aug 23, 2010
Presentation is same as provided to the RC at the July 20, 2010 meeting. Exception is slide #3, which has been updated.
PPT (364k)
Aug 24, 2010
Mass AG presentation regarding an alternative Tie Benefits proposal pertaining to "As Is' versus "At Criteria"
PPT (265k)
Aug 23, 2010
Tie Benefits Calculation Methodology using "As Is" versus 'At Criteria" System Conditions
PPT (1.0Mb)
Aug 24, 2010 DOC (66.5k)
  Copyright ©2012 ISO New England Inc.