Reliability Committee Materials
Aug 16-17, 2010
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
Aug 10, 2010
August 16, 2010 and August 17, 2010 RC Motions Letter
DOC (51k)
Aug 10, 2010
August 16, 2010 and August 17, 2010 TC/RC Summer Meeting Agenda
DOC (92.5k)
Aug 12, 2010
High Level Overview of the Results of the FCA #4 Auction
PDF (380k)
Aug 12, 2010 PDF (370k)
Aug 12, 2010 PDF (351k)
Aug 11, 2010 PPT (474k)
Aug 10, 2010
Level III PPAs from NU for the CPD Berlin Generator and Transmission Project
ZIP (999k)
Aug 10, 2010
Level III PPAs from NU for the Laidlaw Berlin Generator and Transmission Project
ZIP (1.3Mb)
Aug 13, 2010 DOC (31k)
Aug 13, 2010 PPT (329k)
Aug 11, 2010 DOC (27.5k)
Aug 11, 2010 DOC (29k)
Aug 11, 2010 DOC (26.5k)
Aug 11, 2010 DOC (70k)
Aug 11, 2010 DOC (52.5k)
Aug 11, 2010 DOC (25.5k)
Aug 10, 2010 DOC (304k)
Aug 10, 2010 DOC (27k)
Aug 24, 2010
OP18C revised to reflect minor edits as agreed to at the August 16 and August 17, 2010 RC Meeting
DOC (73k)
Aug 11, 2010
Updates to Planning Procedure 4 - Procedure for Pool Supported PTF Cost Review. In addition to updates of Attachment B TCA Form, Attachment D, and Attachment E Correlation Table
ZIP (1.1Mb)
Aug 10, 2010
Updates to Planning Procedure 7 - Procedure for Determining and Implementing Transmission Facility Ratings in New England
ZIP (409k)
Aug 10, 2010
Administrative Updates and Changes to OP 12B - Voltage and Reactive Control
ZIP (1.9Mb)
Aug 11, 2010
Capability of the New England Transmission System to Import From Long Island via the Cross Sound Cable
ZIP (1.2Mb)
Aug 13, 2010
Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities FERC Notice of Proposed Rule Making (NOPR)
PPT (671k)
  Copyright ©2012 ISO New England Inc.