Reliability Committee Materials
Apr 26, 2010
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
Apr 21, 2010
April 26, 2010 RC Motions Letter
DOC (52k)
Apr 21, 2010
PP 10 - Planning Procedure to Support FCM. Conform with MR 1 Sec 12 changes filed with FERC on 02/22/2010
PPT (432k)
Apr 21, 2010
February 26, 2010 RC Meeting Minutes (Draft)
DOC (103k)
Apr 22, 2010
Presentation describing reasons and requirements for pending generator AVR Survey
PPT (446k)
Apr 21, 2010
OP 1A - Central Dispatch Operating Responsibility of ISO, LCCs, and Participants
ZIP (858k)
Apr 21, 2010
OP 7A - Instructions for Implementation of Manual Load Shedding
ZIP (613k)
Apr 21, 2010
OP 10 - Emergency Incident and Disturbance Notifications
ZIP (334k)
Apr 21, 2010
OP 12 - Voltage and Reactive Control
ZIP (533k)
Apr 21, 2010
OP 13 - Standards for Voltage Reduction and Load Shedding Capability
ZIP (608k)
Apr 21, 2010
OP 13B - Standards for Voltage Reduction and Load Shedding Capability - Underfrequency Load Shedding Program Requirements
ZIP (348k)
Apr 21, 2010
OP 13C - Standards for Voltage Reduction and Load Shedding Capability - Underfrequency Load Shedding Implementation Plan
ZIP (316k)
Apr 21, 2010
Level III PPA from CMP for the East Main Street Transformer and Breaker Project
ZIP (991k)
Apr 21, 2010
Level I PPA from CMEEC for Ft Hill Generator Project
ZIP (355k)
Apr 21, 2010
Level I PPA from NU for the Altresco SPS Project
PDF (76.0k)
Apr 26, 2010
Level I PPA submitted by CMP for the Rumford Tramsmission Project PPA
ZIP (1.6Mb)
Apr 21, 2010
Level I PPA from NSTAR for the hopkinton Switch project
ZIP (126k)
Apr 21, 2010
Non-Price Retirement Request from NGRID for Bunker Road Diesel Generators 1-4
ZIP (15.8k)
Apr 21, 2010
Non-Price Retirement Request form NGRID for Sterling Road Diesel Generators
ZIP (16.3k)
Apr 21, 2010
Non-Price Retirement Request from NextEra Energy for the Champion Generator
ZIP (33.9k)
Apr 21, 2010
Non-Price Retirement Request from FPL Maine Energy Hydro for the Lewiston Generator
ZIP (33.6k)
Apr 21, 2010
Non-Price Retirement Request from FPL Maine Energy Hydro for the Ft Halifax Generator
PDF (28.8k)
Apr 21, 2010
Changes to MR 1 Section 12 with regard to the inclusion of Existing Capacity Resources in calculation of ICR
DOC (64.5k)