Reliability Committee Materials
Apr 26, 2010
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.
| Date |
Document Title |
Document Type |
| Apr 21, 2010 |
April 26, 2010 RC Motions Letter |
 |
DOC (52k) |
| Apr 21, 2010 |
PP 10 - Planning Procedure to Support FCM. Conform with MR 1 Sec 12 changes filed with FERC on 02/22/2010 |
 |
PPT (432k) |
| Apr 21, 2010 |
February 26, 2010 RC Meeting Minutes (Draft) |
 |
DOC (103k) |
| Apr 22, 2010 |
Presentation describing reasons and requirements for pending generator AVR Survey |
 |
PPT (446k) |
| Apr 21, 2010 |
OP 1A - Central Dispatch Operating Responsibility of ISO, LCCs, and Participants |
 |
ZIP (858k) |
| Apr 21, 2010 |
OP 7A - Instructions for Implementation of Manual Load Shedding |
 |
ZIP (613k) |
| Apr 21, 2010 |
OP 10 - Emergency Incident and Disturbance Notifications |
 |
ZIP (334k) |
| Apr 21, 2010 |
OP 12 - Voltage and Reactive Control |
 |
ZIP (533k) |
| Apr 21, 2010 |
OP 13 - Standards for Voltage Reduction and Load Shedding Capability |
 |
ZIP (608k) |
| Apr 21, 2010 |
OP 13B - Standards for Voltage Reduction and Load Shedding Capability - Underfrequency Load Shedding Program Requirements |
 |
ZIP (348k) |
| Apr 21, 2010 |
OP 13C - Standards for Voltage Reduction and Load Shedding Capability - Underfrequency Load Shedding Implementation Plan |
 |
ZIP (316k) |
| Apr 21, 2010 |
Level III PPA from CMP for the East Main Street Transformer and Breaker Project |
 |
ZIP (991k) |
| Apr 21, 2010 |
Level I PPA from CMEEC for Ft Hill Generator Project |
 |
ZIP (355k) |
| Apr 21, 2010 |
Level I PPA from NU for the Altresco SPS Project |
 |
PDF (76.0k) |
| Apr 26, 2010 |
Level I PPA submitted by CMP for the Rumford Tramsmission Project PPA |
 |
ZIP (1.6Mb) |
| Apr 21, 2010 |
Level I PPA from NSTAR for the hopkinton Switch project |
 |
ZIP (126k) |
| Apr 21, 2010 |
Non-Price Retirement Request from NGRID for Bunker Road Diesel Generators 1-4 |
 |
ZIP (15.8k) |
| Apr 21, 2010 |
Non-Price Retirement Request form NGRID for Sterling Road Diesel Generators |
 |
ZIP (16.3k) |
| Apr 21, 2010 |
Non-Price Retirement Request from NextEra Energy for the Champion Generator |
 |
ZIP (33.9k) |
| Apr 21, 2010 |
Non-Price Retirement Request from FPL Maine Energy Hydro for the Lewiston Generator |
 |
ZIP (33.6k) |
| Apr 21, 2010 |
Non-Price Retirement Request from FPL Maine Energy Hydro for the Ft Halifax Generator |
 |
PDF (28.8k) |
| Apr 21, 2010 |
Changes to MR 1 Section 12 with regard to the inclusion of Existing Capacity Resources in calculation of ICR |
 |
DOC (64.5k) |