Reliability Committee Actions
2010
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.

Date Document Title Document Type
Sep 01, 2010
July 19, 2010 RC Actions Letter
PDF (99.2k)
Aug 18, 2010
August 16, 2010 and August 17, 2010 RC Actions Letter
PDF (94.9k)
Jun 14, 2010
June 14, 2010 RC Actions Letter
PDF (153k)
May 25, 2010
May 24, 2010 RC Actions Letter
PDF (106k)
Apr 26, 2010
April 26, 2010 RC Actions Letter
PDF (100k)
Mar 26, 2010
RC Actions Letter revised to reflect change in voting results for Agenda Item 8.0 ICR/LSR/MCL Motion. Error was discovered in vote tabulation spreadsheet in AR Sector that changed overall voting results from Failed to Passed with 65.83% In Favor.
PDF (131k)
Mar 01, 2010
February 26, 2010 RC Actions Letter
PDF (99.8k)
Feb 01, 2010
January 20, 2010 RC Actons Letter revised to reflect proper Action Letter format. No changes to voting results.
PDF (64.1k)
Jan 29, 2010
January 28, 2010 RC Actions Letter
PDF (70.7k)
Jan 21, 2010
January 19, 2010 RC Action Letter
PDF (107k)
  Copyright ©2010 ISO New England Inc.